Microvella Fill Coat
Fill Coat DA
Optional step · before sealer. Fills the pores of a coarse texture so the finish wipes clean instead of catching dirt.
Coming soon
We are filming this one now. It will be here before the product ships.
Watch before you apply
Coverage varies based on substrate and application thickness.
How to apply
5 steps
-
1
Check you need it
Run a hand over the cured microcement. If it catches and holds dirt, Fill Coat helps. If the finish came out smooth, skip this step.
-
2
Prep
Sand the microcement layer. It must be fully cured. The surface must be clean and free of dust, oil and grease.
-
3
Mix well
Stir thoroughly before applying. If you are adding pigment, mix for at least 3 minutes with an electric mixer.
-
4
Trowel it on
Apply to the surface and trowel it out with a plastic trowel. Working time is 60 minutes.
-
5
Let dry, then seal
About 1 hour. Then seal as usual. Apply between 41°F and 77°F.
Tinting a batch? Colour amounts are on the tint chart.
Colorant calculatorMicrovella Fill Coat DA (Dry Areas)
11 lb (5 kg) unit, one part, ready to use.
The Microvella Line
Every piece of the system.
Microvella Fill Coat · Coming Late 2026
How much do I need?
Tell us the area and pick your system. We will work out every product, how many units, and what it costs. Add more than one area and we will pool them into a single list.
Coarse is the base texture. Medium sits in between. Smooth goes further and covers more per pail.
For build coat and microcement. A 2.5-gallon pail covers half as much. It suits small jobs, but costs more per sq ft.
0
The difference is product left in the pails. Add more area to the same job and you use it for close to nothing.
| Product | Units | Price | Total |
|---|---|---|---|
| Estimated material cost | |||
| Cost per sq ft, as ordered | |||
| Cost per sq ft, material used | |||
Every figure includes 10% overage and rounds up to whole units. Coverage assumes a prepared, level substrate — rough or porous surfaces drink more. Microvella ships late 2026; prices are shown so you can budget a job now. If a number here disagrees with the pail, go with the pail.
Coming Late 2026
Be first to get it.
Microvella lands late 2026. Join the list and we will email you the day it is ready to order.
You are on the list.
We will email you the day Microvella is ready to order.






